Kickstart Energy Storage III (ERCOT-27INR0471) — Project Summary

Queue ID
ERCOT-27INR0471
Capacity
1.44 MW
Technology
Battery
Status
active
Location
Ellis, TX
Region
ERCOT
Developer
Kickstart Infrastructure LLC
IA Status

Kickstart Energy Storage III

ERCOT-27INR0471BetaActiveOtherBattery Energy StorageERCOTLive · ERCOT

1.44 MW hybrid in Ellis, TX · In queue since March 2025 · Proposed COD September 2029

1.44 MW

Capacity

0

Components

1y 2m

In Queue

IA Status

COD target: 2029

Interconnection

Total Duration

4y 6m

Pre-Study0%
Queue EntryMar 24, 2025

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-09-30

About

Kickstart Energy Storage III is a proposed hybrid energy project in Ellis County, Texas, with a total capacity of 1.44 MW. The project, developed by Kickstart Infrastructure LLC, consists of battery energy storage and other unspecified technologies. It is currently active in the ERCOT interconnection queue as entry ERCOT-27INR0471, with a queue entry date of March 24, 2025, and a proposed commercial operation date of September 30, 2029.

The point of interconnection (POI) for Kickstart Energy Storage III is Tap 345 kV #1906 VENUS_S5 to #68091 NAVARRO.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Ellis

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Kickstart Infrastructure LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

Tap 345 kV #1906 VENUS_S5 to #68091 NAVARRO

Data Source

Live · ERCOT

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Kickstart Energy Storage III