Blackland Prairie 3 Energy Storage (ERCOT-27INR0487) — Project Summary

Queue ID
ERCOT-27INR0487
Capacity
102.1 MW
Technology
Battery
Status
active
Location
Travis, TX
Region
ERCOT
Developer
Tempus power management LLC
IA Status

Blackland Prairie 3 Energy Storage

ERCOT-27INR0487BetaActiveOtherBattery Energy StorageERCOTLive · ERCOT

102.1 MW hybrid in Travis, TX · In queue since March 2025 · Proposed COD December 2027

102.1 MW

Capacity

0

Components

1y 2m

In Queue

IA Status

COD target: 2027

Interconnection

Total Duration

2y 9m

Pre-Study0%
Queue EntryMar 24, 2025

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2027-12-01

About

The Blackland Prairie 3 Energy Storage project is a proposed 102.1 MW hybrid battery storage project located in Travis County, Texas. The project, developed by Tempus Power Management LLC, is interconnected within the ERCOT region under queue ID ERCOT-27INR0487. The project entered the interconnection queue on March 24, 2025, with a proposed commercial operation date of December 1, 2027.

The project consists of battery energy storage and another unspecified technology. It is currently listed as active in the ERCOT interconnection queue. The point of interconnection is the 9328 Austrop 138kV substation. The project has appeared in recent news coverage regarding energy storage development in Texas.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Travis

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Tempus power management LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

9328 Austrop 138kV

Data Source

Live · ERCOT

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_SOUTH
Hub Confidence
MEDIUM
Nearest Node (Estimated)
WEBBER_WS_T1
POI Substation
Austrop Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.