Draco Solar (ERCOT-27INR0499) — Project Summary

Queue ID
ERCOT-27INR0499
Capacity
500 MW
Technology
Solar
Status
active
Location
Borden, TX
Region
ERCOT
Developer
Draco Solar LLC
IA Status

Draco Solar

ERCOT-27INR0499BetaActiveSolarPhotovoltaic SolarERCOTLive · ERCOT

500 MW generation in Borden, TX · In queue since April 2025 · Proposed COD August 2027

500 MW

Capacity

0

Components

1y 1m

In Queue

IA Status

COD target: 2027

Interconnection

Total Duration

2y 4m

Pre-Study0%
Queue EntryApr 21, 2025

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2027-08-19

About

The Draco Solar project is a proposed 500 MW solar generation facility in Borden County, Texas. Developed by Draco Solar LLC, the project is interconnected within the ERCOT region and has appeared in recent industry news.

The project entered the ERCOT interconnection queue as entry ERCOT-27INR0499 on April 21, 2025, with a proposed commercial operation date of August 19, 2027. The point of interconnection is Tap Long Draw (59900) – Faraday (59905) CKT 1 and LONGDRAW (59900) - GALVANI(59912) CKT 2.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Borden

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Draco Solar LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

Tap Long Draw (59900) – Faraday (59905) CKT 1 and LONGDRAW (59900) - GALVANI(59912) CKT 2

Data Source

Live · ERCOT

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.