Mesquite Creek Windpower Repower (ERCOT-27INR0501) — Project Summary

Queue ID
ERCOT-27INR0501
Capacity
212.91 MW
Technology
Wind
Status
active
Location
Dawson, TX
Region
ERCOT
Developer
Mesquite Creek Wind LLC
IA Status

Mesquite Creek Windpower Repower

ERCOT-27INR0501BetaActiveWindWind TurbineERCOTLive · ERCOT

212.91 MW generation in Dawson, TX · In queue since April 2025 · Proposed COD December 2027

212.91 MW

Capacity

0

Components

1y 1m

In Queue

IA Status

COD target: 2027

Interconnection

Total Duration

2y 8m

Pre-Study0%
Queue EntryApr 29, 2025

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2027-12-31

About

The Mesquite Creek Windpower Repower project is a proposed 212.91 MW wind generation project located in Dawson County, Texas. The developer is Mesquite Creek Wind LLC. The project is listed in the ERCOT interconnection queue as entry ERCOT-27INR0501, with a queue entry date of April 29, 2025, and a proposed commercial operation date of December 31, 2027.

The project is linked to the existing Mesquite Creek Wind operating plant (EIA ID 59332). It is currently in the active stage of the interconnection process. Recent news coverage has discussed the project.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Dawson

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Mesquite Creek Wind LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

<59900><Long Draw><345>

Data Source

Live · ERCOT

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_WEST
Hub Confidence
HIGH
Nearest Node (Estimated)
MESQCRK_ALL
POI Substation
Mesquite Creek Wind Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Mesquite Creek Windpower Repower