Paolo Sole Gustine Solar (ERCOT-27INR0515) — Project Summary

Queue ID
ERCOT-27INR0515
Capacity
40.34 MW
Technology
Solar
Status
active
Location
Comanche, TX
Region
ERCOT
Developer
Viridian Power Development, LLC
IA Status

Paolo Sole Gustine Solar

ERCOT-27INR0515BetaActiveSolarPhotovoltaic SolarERCOTLive · ERCOT

40.34 MW generation in Comanche, TX · In queue since May 2025 · Proposed COD July 2028

40.34 MW

Capacity

0

Components

1 year

In Queue

IA Status

COD target: 2028

Interconnection

Total Duration

3y 2m

Pre-Study0%
Queue EntryMay 27, 2025

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-07-11

About

The Paolo Sole Gustine Solar project is a proposed 40.34 MW solar generation project located in Comanche County, Texas. Being developed by Viridian Power Development, LLC, the project is currently active in the ERCOT interconnection queue as entry ERCOT-27INR0515, with a queue entry date of May 27, 2025. The proposed commercial operation date is July 11, 2028.

The project utilizes photovoltaic solar technology and will interconnect at the #273 Gustine 69 kV point of interconnection. The Paolo Sole Gustine Solar project has appeared in recent news coverage regarding energy development in Texas.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Comanche

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Viridian Power Development, LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

#273 Gustine 69 kV

Data Source

Live · ERCOT

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Paolo Sole Gustine Solar