Paolo Sole Hamilton Solar
40.63 MW generation in Hamilton, TX · In queue since May 2025 · Proposed COD July 2028
40.63 MW
Capacity
0
Components
1 year
In Queue
—
IA Status
COD target: 2028
Total Duration
3y 2m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-07-11
The Paolo Sole Hamilton Solar project is a proposed 40.63 MW solar generation project located in Hamilton County, Texas. Developed by Viridian Power Development, LLC, the project consists of photovoltaic solar technology. It is currently active in the ERCOT interconnection queue as entry ERCOT-27INR0516, with a queue entry date of May 27, 2025.
The proposed commercial operation date for the Paolo Sole Hamilton Solar project is July 11, 2028. The point of interconnection is designated as #258 Hamilton 69 kV. The project is listed as a generation project within the ERCOT region.
Generated from interconnection queue and public data sources
State
TX
County
Hamilton
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Viridian Power Development, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
#258 Hamilton 69 kV
Data Source
Live · ERCOT
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Paolo Sole Hamilton Solar