Wagyu BESS SLF
120.55 MW hybrid in Brazoria, TX · In queue since June 2025 · Proposed COD December 2026
120.55 MW
Capacity
0
Components
11 months
In Queue
—
IA Status
COD target: 2026
Total Duration
1y 6m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2026-12-31
The Wagyu BESS SLF project is a proposed 120.55 MW hybrid development located in Brazoria County, Texas. The project, developed by Wagyu BESS, LLC, consists of battery energy storage and another unspecified technology. It is currently active in the ERCOT interconnection queue as entry ERCOT-27INR0519, with a queue entry date of June 19, 2025, and a proposed commercial operation date of December 31, 2026.
The point of interconnection for the project is the 42410 Burke_POI_8 138kV substation. The project has appeared in recent news coverage regarding energy storage projects in Texas.
Generated from interconnection queue and public data sources
State
TX
County
Brazoria
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Wagyu BESS, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
42410 Burke_POI_8 138kV
Data Source
Live · ERCOT
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Wagyu BESS SLF