Siete Wind (ERCOT-27INR0536) — Project Summary

Queue ID
ERCOT-27INR0536
Capacity
492.8 MW
Technology
Wind
Status
active
Location
Webb, TX
Region
ERCOT
Developer
Siete Wind, LLC
IA Status

Siete Wind

ERCOT-27INR0536BetaActiveWindWind TurbineERCOTLive · ERCOT

492.8 MW generation in Webb, TX · In queue since July 2025 · Proposed COD January 2028

492.8 MW

Capacity

0

Components

10 months

In Queue

IA Status

COD target: 2028

Interconnection

Total Duration

2y 6m

Pre-Study0%
Queue EntryJul 7, 2025

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-01-03

About

The Siete Wind project is a proposed 492.8 MW wind generation facility in Webb County, Texas. The project, developed by Siete Wind, LLC, is currently active in the ERCOT interconnection queue as entry ERCOT-27INR0536, with a queue entry date of July 7, 2025. The proposed commercial operation date is January 3, 2028.

The Siete Wind project has been the subject of recent news coverage, with six articles categorized as industry and regulatory news. The point of interconnection is the 345kV 8718 Triada.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Webb

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Siete Wind, LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

345kV 8718 Triada

Data Source

Live · ERCOT

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.