Lytton Springs BESS (ERCOT-27INR0585) — Project Summary

Queue ID
ERCOT-27INR0585
Capacity
76.4 MW
Technology
Battery
Status
active
Location
Caldwell, TX
Region
ERCOT
Developer
SMT Lytton Springs LLC
IA Status

Lytton Springs BESS

ERCOT-27INR0585BetaActiveOtherBattery Energy StorageERCOTLive · ERCOT

76.4 MW hybrid in Caldwell, TX · In queue since December 2025 · Proposed COD December 2029

76.4 MW

Capacity

0

Components

5 months

In Queue

IA Status

COD target: 2029

Interconnection

Total Duration

4 years

Pre-Study0%
Queue EntryDec 2, 2025

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-12-01

About

The Lytton Springs BESS project is a proposed 76.4 MW hybrid battery energy storage project located in Caldwell County, Texas. Developed by SMT Lytton Springs LLC, the project is interconnected to the ERCOT grid under queue ID ERCOT-27INR0585. The project entered the interconnection queue on December 2, 2025, with a proposed commercial operation date of December 1, 2029.

The Lytton Springs BESS project is a hybrid facility that includes battery energy storage. The point of interconnection is the Lytton Springs (#9074) – Fayette Plant (#7055) 345 kV Line. The project has appeared in recent news.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Caldwell

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

SMT Lytton Springs LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

Lytton Springs (#9074) – Fayette Plant (#7055) 345 kV Line

Data Source

Live · ERCOT

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Lytton Springs BESS