Oriole Solar
503.91 MW generation in Knox, TX · In queue since May 2023 · Proposed COD December 2028
503.91 MW
Capacity
1
Components
Solar
3 years
In Queue
Facility Study
IA Status
COD target: 2028
Total Duration
5y 7m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-12-29
Oriole Solar is a proposed 503.91 MW solar generation project located in Knox County, Texas. The developer is Rolling Plain Solar. It is in the ERCOT interconnection queue as entry ERCOT-28INR0008, with a queue entry date of May 15, 2023, and a proposed commercial operation date of December 29, 2028. The project's interconnection agreement status is currently in the Facility Study phase. The point of interconnection is at the Tap 345kV 6076 Foxtail - 60791 Perigee.
The Oriole Solar project has been mentioned in recent news coverage.
Generated from interconnection queue and public data sources
State
TX
County
Knox
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Rolling Plain Solar
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap 345kV 6076 Foxtail - 60791 Perigee
Data Source
LBNL + Live
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- MEDIUM
- Nearest Node (Estimated)
- GPASTURE_ALL
- POI Substation
- Foxtail Switching Station
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Top solar plant owners in the US
Data tables and metrics from the powerplantsinfo.org database.
Compare Texas vs California solar
Summary analysis with parallel narrative sections and visualizations.
Top 10 solar states
Data tables and metrics from the powerplantsinfo.org database.