Varadero Solar (ERCOT-28INR0013) — Project Summary

Queue ID
ERCOT-28INR0013
Capacity
304.74 MW
Technology
Solar
Status
active
Location
Limestone, TX
Region
ERCOT
Developer
NextEra Energy Interconnection Holdings, LLC
IA Status
Facility Study

Varadero Solar

ERCOT-28INR0013BetaActiveSolarERCOTLBNL + Live

304.74 MW generation in Limestone, TX · In queue since July 2023 · Proposed COD April 2029

304.74 MW

Capacity

1

Components

Solar

2y 10m

In Queue

Facility Study

IA Status

COD target: 2029

Interconnection

Total Duration

5y 9m

Facilities Study50%
Queue EntryJul 10, 2023

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-04-01

About

The proposed Varadero Solar project is a 304.74 MW solar generation facility located in Limestone County, Texas. It is being developed by NextEra Energy Interconnection Holdings, LLC. The project is currently active in the ERCOT interconnection queue as entry ERCOT-28INR0013, with a queue entry date of July 10, 2023.

The proposed commercial operation date for Varadero Solar is April 1, 2029. Its interconnection status is currently in the Facility Study phase. The point of interconnection is #68092 Liberty Station 345kV.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Limestone

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

NextEra Energy Interconnection Holdings, LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

#68092 Liberty Station 345kV

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.