Channing Wind (ERCOT-28INR0018) — Project Summary

Queue ID
ERCOT-28INR0018
Capacity
352.38 MW
Technology
Wind
Status
active
Location
Oldham, TX
Region
ERCOT
Developer
NextEra Energy Interconnection Holdings, LLC
IA Status
Facility Study

Channing Wind

ERCOT-28INR0018BetaActiveWindERCOTLBNL

352.38 MW generation in Oldham, TX · In queue since December 2023 · Proposed COD December 2028

352.38 MW

Capacity

1

Components

Wind

2y 5m

In Queue

Facility Study

IA Status

COD target: 2028

Interconnection

Total Duration

5 years

Facilities Study50%
Queue EntryDec 20, 2023

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-12-31

About

The Channing Wind project is a proposed wind generation facility with a total capacity of 352.38 MW. Located in Oldham County, Texas, the project is being developed by NextEra Energy Interconnection Holdings, LLC. It is currently listed as active in the ERCOT interconnection queue under queue ID ERCOT-28INR0018, with an entry date of December 20, 2023. The proposed commercial operation date is December 31, 2028, and the project's interconnection agreement status is currently in the Facility Study phase.

The project consists of 352.38 MW of wind generation capacity. The point of interconnection is the 23906 AJ Swope Station 345kV. The Channing Wind project has appeared in recent news coverage regarding renewable energy development in Texas.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Oldham

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

NextEra Energy Interconnection Holdings, LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

23906 AJ Swope Station 345kV

Data Source

LBNL

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_WEST
Hub Confidence
MEDIUM
POI Substation
AJ Swope Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.