Padua Grid BESS Unit 3 (ERCOT-28INR0024) — Project Summary

Queue ID
ERCOT-28INR0024
Capacity
201.35 MW
Technology
Battery
Status
active
Location
Bexar, TX
Region
ERCOT
Developer
Padua Grid, LLC
IA Status
Facility Study

Padua Grid BESS Unit 3

ERCOT-28INR0024BetaActiveBatteryERCOTLBNL + Live

201.35 MW storage in Bexar, TX · In queue since March 2024 · Proposed COD May 2026

201.35 MW

Capacity

1

Components

Battery

2y 2m

In Queue

Facility Study

IA Status

COD target: 2026

Interconnection

Total Duration

2y 2m

Facilities Study50%
Queue EntryMar 22, 2024

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2026-05-15

About

The Padua Grid BESS Unit 3 is a proposed 201.35 MW battery storage project located in Bexar County, Texas. Developed by Padua Grid, LLC, the project consists entirely of battery storage. It is interconnected within the ERCOT region under queue ID ERCOT-28INR0024, with a queue entry date of March 22, 2024, and a proposed commercial operation date of May 15, 2026. The project's interconnection status is currently in the Facility Study phase.

The proposed project is linked to the existing Padua 3 operating plant (EIA plant ID 68914). The point of interconnection is Tap #5395 O.W Sommer 138kV. The project has appeared in recent news coverage.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Bexar

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Padua Grid, LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

Tap #5395 O.W Sommer 138kV

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_SOUTH
Hub Confidence
HIGH
Nearest Node (Estimated)
RN_PAD3_ESS

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.