Bullring Wind 1
303.5 MW generation in Starr, TX · In queue since May 2024 · Proposed COD June 2028
303.5 MW
Capacity
1
Components
Wind
2 years
In Queue
Facility Study
IA Status
COD target: 2028
Total Duration
4y 1m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-06-30
Bullring Wind 1 is a proposed wind generation project located in Starr County, Texas, with a total capacity of 303.5 MW. Developed by ACE DevCo NC LLC, the project consists entirely of wind generation. It is listed in the ERCOT interconnection queue as entry ERCOT-28INR0037, with a queue entry date of May 9, 2024, and a proposed commercial operation date of June 30, 2028. The project's interconnection status is currently in the Facility Study phase.
The proposed project has been featured in recent news coverage related to the energy industry.
Generated from interconnection queue and public data sources
State
TX
County
Starr
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
ACE DevCo NC LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap 345 kV 80355 DelSol7A - 80079 Cruce Ckt 1
Data Source
LBNL + Live
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.