Black Hawk Solar
251.34 MW generation in Duval, TX · In queue since February 2024 · Proposed COD December 2028
251.34 MW
Capacity
1
Components
Solar
2y 3m
In Queue
Facility Study
IA Status
COD target: 2028
Total Duration
4y 10m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-12-31
Black Hawk Solar is a proposed solar generation project located in Duval County, Texas, within the ERCOT region. The project, developed by ACE DevCo NC, LLC, has a total capacity of 251.34 MW. It consists entirely of solar photovoltaic technology.
The project is listed in the ERCOT interconnection queue as entry ERCOT-28INR0040, with a queue entry date of February 27, 2024. Its proposed commercial operation date is December 31, 2028, and its interconnection agreement status is currently in the Facility Study phase. The point of interconnection is the San Miguel (5901) - Cruce (80079) double circuit transmission line. The project has been mentioned in recent news coverage.
Generated from interconnection queue and public data sources
State
TX
County
Duval
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
ACE DevCo NC, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
San Miguel (5901) - Cruce (80079) double circuit transmission line. Requesting interconnection to both lines on the double circuit. This is a planned double circuit with ISD of 2027.
Data Source
LBNL + Live
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Black Hawk Solar