Verily Solar (FKA Cuello De Cuero Solar)
250 MW generation in Brooks, TX · In queue since March 2024 · Proposed COD July 2029
250 MW
Capacity
1
Components
Solar
2y 2m
In Queue
Facility Study
IA Status
COD target: 2029
Total Duration
5y 4m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2029-07-01
The Verily Solar (FKA Cuello De Cuero Solar) project is a proposed 250 MW solar generation project located in Brooks County, Texas. Developed by NextEra Energy Interconnection Holdings, LLC, the project entered the ERCOT interconnection queue as ERCOT-28INR0059 on March 22, 2024. The proposed commercial operation date is July 1, 2029, and the project's interconnection status is currently in the Facility Study phase.
The project consists of 250 MW of solar photovoltaic generation. It is interconnected at the 80078 Reforzar Switch Station 345kV. The project is currently listed as active within the ERCOT interconnection queue.
Generated from interconnection queue and public data sources
State
TX
County
Brooks
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
NextEra Energy Interconnection Holdings, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
80078 Reforzar Switch Station 345kV
Data Source
LBNL + Live
- ISO / RTO
- ERCOT
- Trading Hub
- HB_SOUTH
- Hub Confidence
- MEDIUM
- Nearest Node (Estimated)
- STAR_SLR_RN
- POI Substation
- Roma Switching Station