Sunrose Renewable Energy Solar SLF
300.88 MW generation in Austin, TX · In queue since April 2024 · Proposed COD December 2029
300.88 MW
Capacity
1
Components
Solar
2y 1m
In Queue
Facility Study
IA Status
COD target: 2029
Total Duration
5y 8m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2029-12-31
Sunrose Renewable Energy Solar SLF is a proposed solar generation project located in Austin County, Texas, within the ERCOT region. Developed by Sunrose Renewable Energy LLC, the project has a total capacity of 300.88 MW, consisting entirely of solar photovoltaic generation. The project entered the ERCOT interconnection queue as entry ERCOT-28INR0061 on April 9, 2024, and has a proposed commercial operation date of December 31, 2029. Its interconnection status is currently in the Facility Study phase.
The proposed project has been mentioned in recent news coverage.
Generated from interconnection queue and public data sources
State
TX
County
Austin
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Sunrose Renewable Energy LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap 138kV #44740 WALLIS - #44700 GEBHRT
Data Source
LBNL + Live
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Sunrose Renewable Energy Solar SLF