Bluefox Solar 3 (ERCOT-28INR0064) — Project Summary

Queue ID
ERCOT-28INR0064
Capacity
201.8 MW
Technology
Solar
Status
active
Location
Matagorda, TX
Region
ERCOT
Developer
Industrial November Project LLC
IA Status
Facility Study

Bluefox Solar 3

ERCOT-28INR0064BetaActiveSolarERCOTLBNL + Live

201.8 MW generation in Matagorda, TX · In queue since March 2024 · Proposed COD April 2030

201.8 MW

Capacity

1

Components

Solar

2y 2m

In Queue

Facility Study

IA Status

COD target: 2030

Interconnection

Total Duration

6y 1m

Facilities Study50%
Queue EntryMar 22, 2024

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2030-04-18

About

Bluefox Solar 3 is a proposed solar generation project with a total capacity of 201.8 MW, located in Matagorda County, Texas. The developer is Industrial November Project LLC. The project is currently active in the ERCOT interconnection queue as entry ERCOT-28INR0064, with a queue entry date of March 22, 2024, and a proposed commercial operation date of April 18, 2030. The interconnection status is currently in the Facility Study phase.

The proposed project consists of 201.8 MW of solar generation. It is planned to connect to the #8754 Zoisite 345kV point of interconnection. The project has appeared in recent news coverage.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Matagorda

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Industrial November Project LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

#8754 Zoisite 345kV

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Bluefox Solar 3