Mirando Valley Wind (ERCOT-28INR0072) — Project Summary

Queue ID
ERCOT-28INR0072
Capacity
351 MW
Technology
Wind
Status
active
Location
Jim Hogg, TX
Region
ERCOT
Developer
ACE DevCo NC LLC
IA Status
Facility Study

Mirando Valley Wind

ERCOT-28INR0072BetaActiveWindERCOTLBNL + Live

351 MW generation in Jim Hogg, TX · In queue since August 2024 · Proposed COD July 2028

351 MW

Capacity

1

Components

Wind

1y 9m

In Queue

Facility Study

IA Status

COD target: 2028

Interconnection

Total Duration

3y 11m

Facilities Study50%
Queue EntryAug 16, 2024

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-07-06

About

The Mirando Valley Wind project is a proposed 351 MW wind generation facility in Jim Hogg County, Texas. The project, being developed by ACE DevCo NC LLC, is located within the ERCOT region and interconnected to the grid at Tap 345kV 80220 Cenizo - 80079 Cruce Ckt-1.

The project is listed in the ERCOT interconnection queue as entry ERCOT-28INR0072, with a queue entry date of August 16, 2024. Its proposed commercial operation date is July 6, 2028, and its interconnection agreement status is currently in the Facility Study phase.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Jim Hogg

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

ACE DevCo NC LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

Tap 345kV 80220 Cenizo - 80079 Cruce Ckt-1

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_SOUTH
Hub Confidence
MEDIUM
POI Substation
Cenizo Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.