Daystar Solar
150 MW generation in Karnes, TX · In queue since April 2024 · Proposed COD March 2028
150 MW
Capacity
1
Components
Solar
2y 1m
In Queue
Facility Study
IA Status
COD target: 2028
Total Duration
3y 11m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-03-15
Daystar Solar is a proposed 150 MW solar generation project located in Karnes County, Texas. The project, developed by Choate Solar, LLC, is in the ERCOT interconnection queue as entry ERCOT-28INR0073, with a queue entry date of April 15, 2024. The proposed commercial operation date is March 15, 2028.
The project's interconnection status is currently in the Facility Study phase. The point of interconnection is the 5728 Choate 138kV substation.
Generated from interconnection queue and public data sources
State
TX
County
Karnes
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Choate Solar, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
5728 Choate 138kV
Data Source
LBNL + Live
- ISO / RTO
- ERCOT
- Trading Hub
- HB_SOUTH
- Hub Confidence
- MEDIUM
- POI Substation
- Choate Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Daystar Solar