EmberYork (TEF - Due Diligence)
900 MW generation in Austin, TX · Proposed COD January 2028
900 MW
Capacity
1
Components
Gas
—
In Queue
Facility Study
IA Status
COD target: 2028
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-01-01
EmberYork Energy Center is proposing a 900 MW natural gas-fired generation project called EmberYork (TEF - Due Diligence) in Austin County, Texas. The project, identified as ERCOT-28INR0089 in the ERCOT interconnection queue, entered the queue with a proposed commercial operation date of January 1, 2028. Its interconnection status is currently in the Facility Study phase.
The proposed project has been the subject of recent news coverage, with two articles categorized as regulatory and industry news.
Generated from interconnection queue and public data sources
State
TX
County
Austin
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
EmberYork Energy Center
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
TAP 138kV WALLIS 44740 - GERBHRT 44700
Data Source
LBNL + Live
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.