Elk Ridge Solar
503 MW generation in Pecos, TX · In queue since November 2025 · Proposed COD July 2030
503 MW
Capacity
0
Components
6 months
In Queue
—
IA Status
COD target: 2030
Total Duration
4y 8m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2030-07-01
Elk Ridge Solar is a proposed 503 MW solar photovoltaic generation project located in Pecos County, Texas. The project is being developed by Boulevard Associates, LLC and is interconnected within the ERCOT region. It is listed in the ERCOT interconnection queue as entry 28INR0114, with a queue entry date of November 5, 2025, and a proposed commercial operation date of July 1, 2030. The point of interconnection is the AEP Solstice Substation #60404.
The Elk Ridge Solar project has been the subject of recent news coverage, with nine articles appearing in industry and development publications.
Generated from interconnection queue and public data sources
State
TX
County
Pecos
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Boulevard Associates, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
AEP Solstice Substation #60404
Data Source
Live · ERCOT
- ISO / RTO
- ERCOT
- Trading Hub
- HB_WEST
- Hub Confidence
- MEDIUM
- Nearest Node (Estimated)
- HOVEY_GEN
- POI Substation
- Solstice Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Top solar plant owners in the US
Data tables and metrics from the powerplantsinfo.org database.
Compare Texas vs California solar
Summary analysis with parallel narrative sections and visualizations.
Top 10 solar states
Data tables and metrics from the powerplantsinfo.org database.