Copperleaf Energy Storage (ERCOT-28INR0118) — Project Summary

Queue ID
ERCOT-28INR0118
Capacity
167.2 MW
Technology
Battery
Status
active
Location
Wichita, TX
Region
ERCOT
Developer
Copperleaf Energy Storage, LLC
IA Status
Facility Study

Copperleaf Energy Storage

ERCOT-28INR0118BetaActiveBatteryERCOTLBNL + Live

167.2 MW storage in Wichita, TX · In queue since November 2024 · Proposed COD April 2029

167.2 MW

Capacity

1

Components

Battery

1y 6m

In Queue

Facility Study

IA Status

COD target: 2029

Interconnection

Total Duration

4y 5m

Facilities Study50%
Queue EntryNov 19, 2024

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-04-18

About

Copperleaf Energy Storage is a proposed 167.2 MW battery storage project located in Wichita County, Texas. The project, developed by Copperleaf Energy Storage, LLC, is currently active in the ERCOT interconnection queue as entry ERCOT-28INR0118, with a queue entry date of November 19, 2024. Its proposed commercial operation date is April 18, 2029, and its interconnection agreement status is currently in the Facility Study phase.

The proposed project consists entirely of battery storage, with a total capacity of 167.2 MW. The point of interconnection is at the 1426 FISHER ROAD SWITCH 138 kV location. The project has appeared in recent news coverage.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Wichita

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Copperleaf Energy Storage, LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

1426 FISHER ROAD SWITCH 138 kV

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.