Silverbell Solar (ERCOT-28INR0125) — Project Summary

Queue ID
ERCOT-28INR0125
Capacity
125.63 MW
Technology
Solar
Status
active
Location
Red River, TX
Region
ERCOT
Developer
Silverbell Energy Center, LLC
IA Status
Facility Study

Silverbell Solar

ERCOT-28INR0125BetaActiveSolarERCOTLBNL + Live

125.63 MW generation in Red River, TX · In queue since August 2024 · Proposed COD September 2028

125.63 MW

Capacity

1

Components

Solar

1y 9m

In Queue

Facility Study

IA Status

COD target: 2028

Interconnection

Total Duration

4y 1m

Facilities Study50%
Queue EntryAug 16, 2024

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-09-30

About

Silverbell Solar is a proposed solar generation project with a total capacity of 125.63 MW. The project, located in Red River County, Texas, is being developed by Silverbell Energy Center, LLC. It is currently in the ERCOT interconnection queue as entry ERCOT-28INR0125, with a queue entry date of August 16, 2024.

The proposed commercial operation date for Silverbell Solar is September 30, 2028. The project's interconnection status is currently in the Facility Study phase. The point of interconnection is Tap 138kV Rivercrest SES 1780 - Deport REA 1768. The project has appeared in recent news.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Red River

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Silverbell Energy Center, LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

Tap 138kV Rivercrest SES 1780 - Deport REA 1768

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Silverbell Solar