River Boat Solar
502.2 MW generation in Mitchell, TX · In queue since September 2024 · Proposed COD September 2028
502.2 MW
Capacity
1
Components
Solar
1y 8m
In Queue
Facility Study
IA Status
COD target: 2028
Total Duration
4 years
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-09-25
River Boat Solar is a proposed solar generation project with a total capacity of 502.2 MW. The project, located in Mitchell County, Texas, is being developed by Champion Creek Solar, LLC. It is listed in the ERCOT interconnection queue as entry ERCOT-28INR0132, with a queue entry date of September 4, 2024, and a proposed commercial operation date of September 25, 2028. The project's interconnection status is currently in the Facility Study phase.
The River Boat Solar project has been mentioned in recent news coverage related to regulatory and industry topics.
Generated from interconnection queue and public data sources
State
TX
County
Mitchell
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Champion Creek Solar, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap 345 kV Bus # 10053 Cattlemen 5 - Bus #76030 Gasconades Creek
Data Source
LBNL + Live
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Last updated 2026-03-26
View all articlesTop solar plant owners in the US
Data tables and metrics from the powerplantsinfo.org database.
Compare Texas vs California solar
Summary analysis with parallel narrative sections and visualizations.
Top 10 solar states
Data tables and metrics from the powerplantsinfo.org database.