Callisto 1C Energy Center (ERCOT-28INR0154) — Project Summary

Queue ID
ERCOT-28INR0154
Capacity
103.8 MW
Technology
Battery
Status
active
Location
Harris, TX
Region
ERCOT
Developer
Tempus Power management LLC
IA Status
Facility Study

Callisto 1C Energy Center

ERCOT-28INR0154BetaActiveBatteryERCOTLBNL + Live

103.8 MW storage in Harris, TX · In queue since September 2024 · Proposed COD July 2026

103.8 MW

Capacity

1

Components

Battery

1y 8m

In Queue

Facility Study

IA Status

COD target: 2026

Interconnection

Total Duration

1y 10m

Facilities Study50%
Queue EntrySep 10, 2024

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2026-07-20

About

The Callisto 1C Energy Center is a proposed 103.8 MW battery storage project located in Harris County, Texas. Developed by Tempus Power Management LLC, the project is interconnected within the Electric Reliability Council of Texas (ERCOT) region. It entered the ERCOT interconnection queue as project number ERCOT-28INR0154 on September 10, 2024, with a proposed commercial operation date of July 20, 2026. The project's interconnection status is currently in the Facility Study phase.

The proposed project consists of 103.8 MW of battery storage capacity. Recent news coverage has discussed the development.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Harris

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Tempus Power management LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

#47150 HOC 138kV

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Callisto 1C Energy Center