Sisters Solar II (ERCOT-28INR0177) — Project Summary

Queue ID
ERCOT-28INR0177
Capacity
205.54 MW
Technology
Solar
Status
active
Location
Ector, TX
Region
ERCOT
Developer
Oberon Solar III, LLC
IA Status
Facility Study

Sisters Solar II

ERCOT-28INR0177BetaActiveSolarERCOTLBNL + Live

205.54 MW generation in Ector, TX · In queue since October 2024 · Proposed COD December 2028

205.54 MW

Capacity

1

Components

Solar

1y 7m

In Queue

Facility Study

IA Status

COD target: 2028

Interconnection

Total Duration

4y 2m

Facilities Study50%
Queue EntryOct 21, 2024

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-12-15

About

Sisters Solar II is a proposed solar generation project located in Ector County, Texas, within the ERCOT region. The project, developed by Oberon Solar III, LLC, has a total capacity of 205.54 MW. It consists entirely of solar photovoltaic generation.

The project is currently active in the ERCOT interconnection queue as entry ERCOT-28INR0177, with a queue entry date of October 21, 2024. Its proposed commercial operation date is December 15, 2028, and its interconnection agreement status is currently in the Facility Study phase. The point of interconnection is at the tap 345kV 11010 Wolf Switching Station - 10012 Meteor. The project has been mentioned in recent news coverage.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Ector

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Oberon Solar III, LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

tap 345kV 11010 Wolf Switching Station - 10012 Meteor

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
MEDIUM
Nearest Node (Estimated)
WHCCS2_CC2
POI Substation
Wolf Hollow Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Sisters Solar II