Ashra Storage SLF
1.62 MW hybrid in Uvalde, TX · In queue since April 2025 · Proposed COD June 2028
1.62 MW
Capacity
0
Components
1y 1m
In Queue
—
IA Status
COD target: 2028
Total Duration
3y 2m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-06-14
The Ashra Storage SLF project is a proposed 1.62 MW hybrid battery energy storage project located in Uvalde County, Texas. Developed by Ashra Solar, LLC, the project consists of battery energy storage and other unspecified technologies.
The project is currently active in the ERCOT interconnection queue as entry ERCOT-28INR0190, with a queue entry date of April 25, 2025, and a proposed commercial operation date of June 14, 2028. The point of interconnection is at the Tap 69kV 5823 UVALDE Switch - 5820 UVALDE SUB.
Generated from interconnection queue and public data sources
State
TX
County
Uvalde
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Ashra Solar, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap 69kV 5823 UVALDE Switch - 5820 UVALDE SUB
Data Source
Live · ERCOT
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Ashra Storage SLF