San Gabriel Storage (ERCOT-28INR0191) — Project Summary

Queue ID
ERCOT-28INR0191
Capacity
127.5 MW
Technology
Battery
Status
active
Location
Milam, TX
Region
ERCOT
Developer
San Gabriel Solar LLC
IA Status

San Gabriel Storage

ERCOT-28INR0191BetaActiveOtherBattery Energy StorageERCOTLive · ERCOT

127.5 MW hybrid in Milam, TX · In queue since January 2025 · Proposed COD July 2028

127.5 MW

Capacity

0

Components

1y 4m

In Queue

IA Status

COD target: 2028

Interconnection

Total Duration

3y 6m

Pre-Study0%
Queue EntryJan 28, 2025

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-07-01

About

The San Gabriel Storage project is a proposed 127.5 MW hybrid battery energy storage project located in Milam County, Texas. Developed by San Gabriel Solar LLC, the project consists of battery energy storage paired with an unspecified "other" technology. It is listed in the ERCOT interconnection queue as entry ERCOT-28INR0191, with a queue entry date of January 28, 2025.

The project's proposed commercial operation date is July 1, 2028. The point of interconnection is Tap 138 kV 3750 Vosslake - 3749 Buckholts. The project is currently listed as active in the interconnection queue.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Milam

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

San Gabriel Solar LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

Tap 138 kV 3750 Vosslake - 3749 Buckholts

Data Source

Live · ERCOT

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.