Winters Glow Solar
252.94 MW generation in Runnels, TX · In queue since October 2024 · Proposed COD September 2028
252.94 MW
Capacity
1
Components
Solar
1y 7m
In Queue
Facility Study
IA Status
COD target: 2028
Total Duration
3y 11m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-09-19
Winters Glow Solar is a proposed solar generation project located in Runnels County, Texas, with a total capacity of 252.94 MW. Developed by Winters Glow Solar, LLC, the project consists entirely of solar photovoltaic generation. It is currently active in the ERCOT interconnection queue as project ERCOT-28INR0198, with a queue entry date of October 29, 2024, and a proposed commercial operation date of September 19, 2028. The project's interconnection status is currently in the Facility Study phase.
The proposed point of interconnection is the tap 345kV 1444 BROWN SWITCH - 11406 CENTRAL BLUFF. The project has been mentioned in recent news coverage related to the electric grid.
Generated from interconnection queue and public data sources
State
TX
County
Runnels
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Winters Glow Solar, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
tap 345kV 1444 BROWN SWITCH - 11406 CENTRAL BLUFF
Data Source
LBNL + Live
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Winters Glow Solar