Winters Glow Solar (ERCOT-28INR0198) — Project Summary

Queue ID
ERCOT-28INR0198
Capacity
252.94 MW
Technology
Solar
Status
active
Location
Runnels, TX
Region
ERCOT
Developer
Winters Glow Solar, LLC
IA Status
Facility Study

Winters Glow Solar

ERCOT-28INR0198BetaActiveSolarERCOTLBNL + Live

252.94 MW generation in Runnels, TX · In queue since October 2024 · Proposed COD September 2028

252.94 MW

Capacity

1

Components

Solar

1y 7m

In Queue

Facility Study

IA Status

COD target: 2028

Interconnection

Total Duration

3y 11m

Facilities Study50%
Queue EntryOct 29, 2024

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-09-19

About

Winters Glow Solar is a proposed solar generation project located in Runnels County, Texas, with a total capacity of 252.94 MW. Developed by Winters Glow Solar, LLC, the project consists entirely of solar photovoltaic generation. It is currently active in the ERCOT interconnection queue as project ERCOT-28INR0198, with a queue entry date of October 29, 2024, and a proposed commercial operation date of September 19, 2028. The project's interconnection status is currently in the Facility Study phase.

The proposed point of interconnection is the tap 345kV 1444 BROWN SWITCH - 11406 CENTRAL BLUFF. The project has been mentioned in recent news coverage related to the electric grid.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Runnels

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Winters Glow Solar, LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

tap 345kV 1444 BROWN SWITCH - 11406 CENTRAL BLUFF

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Winters Glow Solar