Gypsum Plains Solar
503.12 MW generation in Ector, TX · In queue since June 2025 · Proposed COD June 2029
503.12 MW
Capacity
0
Components
11 months
In Queue
—
IA Status
COD target: 2029
Total Duration
4 years
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2029-06-21
The Gypsum Plains Solar project is a proposed 503.12 MW solar generation facility in Ector County, Texas. Developed by Gypsum Plains Solar, LLC, the project is currently active in the ERCOT interconnection queue as entry ERCOT-28INR0205, with a queue entry date of June 5, 2025. The proposed commercial operation date is June 21, 2029.
The project will interconnect to the ERCOT grid at the Tap 345kV line Wolf BUS# 11010 - Reiter BUS#18544. The technology used will be photovoltaic solar. The project has appeared in recent news.
Generated from interconnection queue and public data sources
State
TX
County
Ector
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Gypsum Plains Solar, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap 345kv line Wolf BUS# 11010 - Reiter BUS#18544
Data Source
Live · ERCOT
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Top solar plant owners in the US
Data tables and metrics from the powerplantsinfo.org database.
Compare Texas vs California solar
Summary analysis with parallel narrative sections and visualizations.
Top 10 solar states
Data tables and metrics from the powerplantsinfo.org database.