Wagon Timber Solar (ERCOT-28INR0206) — Project Summary

Queue ID
ERCOT-28INR0206
Capacity
172.1 MW
Technology
Solar
Status
active
Location
Knox, TX
Region
ERCOT
Developer
Wagon Timber Solar, LLC
IA Status
Facility Study

Wagon Timber Solar

ERCOT-28INR0206BetaActiveSolarERCOTLBNL + Live

172.1 MW generation in Knox, TX · In queue since December 2024 · Proposed COD October 2028

172.1 MW

Capacity

1

Components

Solar

1y 5m

In Queue

Facility Study

IA Status

COD target: 2028

Interconnection

Total Duration

3y 10m

Facilities Study50%
Queue EntryDec 19, 2024

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-10-16

About

The Wagon Timber Solar project is a proposed 172.1 MW solar generation facility in Knox County, Texas. Developed by Wagon Timber Solar, LLC, the project is currently active in the ERCOT interconnection queue as entry ERCOT-28INR0206, with a queue entry date of December 19, 2024. The proposed commercial operation date is October 16, 2028, and the project's interconnection agreement status is currently in the Facility Study phase.

The proposed project consists of 172.1 MW of solar photovoltaic generation. The point of interconnection is the 6110 Munday East 138kV substation. The Wagon Timber Solar project has appeared in recent news coverage regarding renewable energy development in Texas.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Knox

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Wagon Timber Solar, LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

6110 Munday East 138kV

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
MEDIUM
POI Substation
East Munday Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.