Wagon Timber Storage
53.49 MW hybrid in Knox, TX · In queue since January 2025 · Proposed COD October 2028
53.49 MW
Capacity
0
Components
1y 4m
In Queue
—
IA Status
COD target: 2028
Total Duration
3y 9m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-10-16
The Wagon Timber Storage project is a proposed 53.49 MW hybrid battery energy storage project located in Knox County, Texas. Developed by Wagon Timber Storage, LLC, the project consists of battery energy storage and other unspecified technologies. It is currently active in the ERCOT interconnection queue as entry ERCOT-28INR0207, with a queue entry date of January 13, 2025.
The proposed commercial operation date for the Wagon Timber Storage project is October 16, 2028. The point of interconnection is the 6110 Munday East 138kV location.
Generated from interconnection queue and public data sources
State
TX
County
Knox
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Wagon Timber Storage, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
6110 Munday East 138kV
Data Source
Live · ERCOT
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- MEDIUM
- POI Substation
- East Munday Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.