GPlains Solar
151.29 MW generation in Ector, TX · In queue since April 2025 · Proposed COD June 2029
151.29 MW
Capacity
0
Components
1y 1m
In Queue
—
IA Status
COD target: 2029
Total Duration
4y 2m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2029-06-21
The GPlains Solar project is a proposed solar generation project with a total capacity of 151.29 MW. It is located in Ector County, Texas, and is being developed by Gypsum Plains Solar, LLC. The project is interconnected within the ERCOT region and has appeared in recent news.
The project is listed in the ERCOT interconnection queue as entry ERCOT-28INR0227, with a queue entry date of April 21, 2025. The proposed commercial operation date is June 21, 2029.
Generated from interconnection queue and public data sources
State
TX
County
Ector
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Gypsum Plains Solar, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap 138kV #1013 WOLFSS_8 - #1103 SANDHLTA_8
Data Source
Live · ERCOT
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.