Eligius BESS (ERCOT-28INR0247) — Project Summary

Queue ID
ERCOT-28INR0247
Capacity
174.66 MW
Technology
Battery
Status
active
Location
Hidalgo, TX
Region
ERCOT
Developer
Eligius Storage LLC
IA Status

Eligius BESS

ERCOT-28INR0247BetaActiveOtherBattery Energy StorageERCOTLive · ERCOT

174.66 MW hybrid in Hidalgo, TX · In queue since February 2025 · Proposed COD November 2028

174.66 MW

Capacity

0

Components

1y 3m

In Queue

IA Status

COD target: 2028

Interconnection

Total Duration

3y 9m

Pre-Study0%
Queue EntryFeb 25, 2025

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-11-28

About

The Eligius BESS project is a proposed 174.66 MW hybrid battery energy storage project located in Hidalgo County, Texas. Developed by Eligius Storage LLC, the project consists of battery energy storage and other unspecified technologies. It is currently active in the ERCOT interconnection queue as entry ERCOT-28INR0247, with a queue entry date of February 25, 2025.

The proposed commercial operation date for the Eligius BESS project is November 28, 2028. The point of interconnection is on the tap 138kV Liston (#8394) – JL Bates (#8392) line, managed by AEP. The project has appeared in recent news coverage regarding energy storage developments in Texas.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Hidalgo

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Eligius Storage LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

tap 138kV Liston (#8394) – JL Bates (#8392) line, AEP

Data Source

Live · ERCOT

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.