Three Ranches Solar (ERCOT-28INR0271) — Project Summary

Queue ID
ERCOT-28INR0271
Capacity
125.53 MW
Technology
Solar
Status
active
Location
Brewster, TX
Region
ERCOT
Developer
Three Ranches Energy LLC
IA Status

Three Ranches Solar

ERCOT-28INR0271BetaActiveSolarPhotovoltaic SolarERCOTLive · ERCOT

125.53 MW generation in Brewster, TX · In queue since February 2025 · Proposed COD January 2027

125.53 MW

Capacity

0

Components

1y 3m

In Queue

IA Status

COD target: 2027

Interconnection

Total Duration

1y 11m

Pre-Study0%
Queue EntryFeb 14, 2025

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2027-01-30

About

Three Ranches Solar is a proposed solar generation project with a total capacity of 125.53 MW. The project, developed by Three Ranches Energy LLC, is located in Brewster County, Texas, within the ERCOT region. It consists of photovoltaic solar technology.

The project is listed in the ERCOT interconnection queue as entry ERCOT-28INR0271, with a queue entry date of February 14, 2025. The proposed commercial operation date is January 30, 2027. The point of interconnection is TAP 138kV #6680 Alamitto Creek - #60444 Hayter Ranch. The project has been mentioned in recent news coverage.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Brewster

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Three Ranches Energy LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

TAP 138kV #6680 Alamitto Creek - #60444 Hayter Ranch

Data Source

Live · ERCOT

DeveloperEnel North AmericaPOWER Magazine · 2025-09-14
TransactionPPAPOWER Magazine · 2025-09-14
OfftakerMarsPOWER Magazine · 2025-09-14
PPA structurePhysicalPOWER Magazine · 2025-09-14
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

News & Articles (1)Beta

Last updated 2026-03-26

View all articles

No ask pi reports yet for this entity.

ask pi about Three Ranches Solar