Jukebox Solar (ERCOT-28INR0281) — Project Summary

Queue ID
ERCOT-28INR0281
Capacity
281 MW
Technology
Solar
Status
active
Location
Frio, TX
Region
ERCOT
Developer
ACE DevCo NC, LLC
IA Status

Jukebox Solar

ERCOT-28INR0281BetaActiveSolarPhotovoltaic SolarERCOTLive · ERCOT

281 MW generation in Frio, TX · In queue since June 2025 · Proposed COD July 2027

281 MW

Capacity

0

Components

11 months

In Queue

IA Status

COD target: 2027

Interconnection

Total Duration

2y 1m

Pre-Study0%
Queue EntryJun 19, 2025

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2027-07-01

About

Jukebox Solar is a proposed 281 MW solar photovoltaic generation project in Frio County, Texas. Developed by ACE DevCo NC, LLC, the project is currently active in the ERCOT interconnection queue as entry ERCOT-28INR0281, with a queue entry date of June 19, 2025. The proposed commercial operation date is July 1, 2027.

The project intends to interconnect at the 8221 BIG FOOT4A 138kV point of interconnection.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Frio

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

ACE DevCo NC, LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

8221 BIG FOOT4A 138kV

Data Source

Live · ERCOT

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.