Prairie Power Wind
302.9 MW generation in Mitchell, TX · In queue since June 2025 · Proposed COD April 2029
302.9 MW
Capacity
0
Components
11 months
In Queue
—
IA Status
COD target: 2029
Total Duration
3y 10m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2029-04-17
Prairie Power Wind is a proposed 302.9 MW wind generation project located in Mitchell County, Texas. The project, developed by Prairie Power Wind, LLC, is currently active in the ERCOT interconnection queue as entry ERCOT-28INR0307, with a queue entry date of June 5, 2025. The proposed commercial operation date is April 17, 2029.
The project has been the subject of recent news coverage, with 14 articles related to industry, regulatory, grid, and development aspects of the project.
Generated from interconnection queue and public data sources
State
TX
County
Mitchell
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Prairie Power Wind, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
TAP 345KV BUS #1058 LONGSHORE_5 - BUS #10053 CATTLEMEN_5
Data Source
Live · ERCOT
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Last updated 2026-03-26