Falcon Solar
501.96 MW generation in Zapata, TX · In queue since October 2025 · Proposed COD June 2028
501.96 MW
Capacity
0
Components
7 months
In Queue
—
IA Status
COD target: 2028
Total Duration
2y 8m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-06-24
Falcon Solar is a proposed 501.96 MW solar photovoltaic generation project located in Zapata County, Texas. The project, developed by Falcon Energy Project, LLC, is currently active in the ERCOT interconnection queue as entry ERCOT-28INR0317, with a queue entry date of October 28, 2025. The proposed commercial operation date is June 24, 2028. The point of interconnection is Tap 345kV #80225 Cenizo7C to #80307 Del Sol7C.
The Falcon Solar project has appeared in recent news coverage regarding energy development in Texas.
Generated from interconnection queue and public data sources
State
TX
County
Zapata
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Falcon Energy Project, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap 345kV #80225 Cenizo7C to #80307 Del Sol7C
Data Source
Live · ERCOT
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Top solar plant owners in the US
Data tables and metrics from the powerplantsinfo.org database.
Compare Texas vs California solar
Summary analysis with parallel narrative sections and visualizations.
Top 10 solar states
Data tables and metrics from the powerplantsinfo.org database.