Velociraptor Solar II (ERCOT-28INR0322) — Project Summary

Queue ID
ERCOT-28INR0322
Capacity
251.73 MW
Technology
Solar
Status
active
Location
Ector, TX
Region
ERCOT
Developer
Greyhound Solar 3 LLC
IA Status

Velociraptor Solar II

ERCOT-28INR0322BetaActiveSolarPhotovoltaic SolarERCOTLive · ERCOT

251.73 MW generation in Ector, TX · In queue since May 2025 · Proposed COD November 2028

251.73 MW

Capacity

0

Components

1 year

In Queue

IA Status

COD target: 2028

Interconnection

Total Duration

3y 6m

Pre-Study0%
Queue EntryMay 27, 2025

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-11-17

About

The Velociraptor Solar II project is a proposed 251.73 MW solar photovoltaic generation facility in Ector County, Texas. Developed by Greyhound Solar 3 LLC, the project is currently active in the ERCOT interconnection queue as entry ERCOT-28INR0322, with a queue entry date of May 27, 2025. The proposed commercial operation date is November 17, 2028.

The point of interconnection is the tap south bus Odessa EHV SW (11028) - Wolf Switch (11010) 345KV section at (31.740371, -102.502076). The project has appeared in recent news coverage regarding renewable energy development in Texas.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Ector

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Greyhound Solar 3 LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

Tap south bus Odessa EHV SW (11028) - Wolf Switch (11010) 345KV section at (31.740371, -102.502076)

Data Source

Live · ERCOT

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Velociraptor Solar II