Velociraptor BESS II
261.29 MW hybrid in Ector, TX · In queue since May 2025 · Proposed COD November 2028
261.29 MW
Capacity
0
Components
1 year
In Queue
—
IA Status
COD target: 2028
Total Duration
3y 6m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-11-17
The Velociraptor BESS II project is a proposed 261.29 MW hybrid battery energy storage project in Ector County, Texas. Developed by Greyhound BESS 3 LLC, the project consists of battery and other unspecified technologies. It is currently active in the ERCOT interconnection queue as entry ERCOT-28INR0323, with a queue entry date of May 27, 2025, and a proposed commercial operation date of November 17, 2028.
The project's point of interconnection (POI) is at #11028 Odessa EHV SW - #11010 Wolf Switch 345K. The project has appeared in recent news coverage regarding energy storage developments in Texas.
Generated from interconnection queue and public data sources
State
TX
County
Ector
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Greyhound BESS 3 LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
#11028 Odessa EHV SW - #11010 Wolf Switch 345K
Data Source
Live · ERCOT
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Velociraptor BESS II