Cielo Vista Power Gas Plant (ERCOT-28INR0325) — Project Summary

Queue ID
ERCOT-28INR0325
Capacity
334.7 MW
Technology
Gas
Status
active
Location
Duval, TX
Region
ERCOT
Developer
Cielo Vista Power, LLC
IA Status

Cielo Vista Power Gas Plant

ERCOT-28INR0325BetaActiveGasInternal CombustionERCOTLive · ERCOT

334.7 MW generation in Duval, TX · In queue since August 2025 · Proposed COD June 2028

334.7 MW

Capacity

0

Components

9 months

In Queue

IA Status

COD target: 2028

Interconnection

Total Duration

2y 10m

Pre-Study0%
Queue EntryAug 18, 2025

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-06-30

About

The Cielo Vista Power Gas Plant is a proposed 334.7 MW gas-fired generation project in Duval County, Texas. Being developed by Cielo Vista Power, LLC, the project consists of internal combustion technology and is interconnected within the ERCOT region. The project entered the ERCOT interconnection queue as entry 28INR0325 on August 18, 2025, with a proposed commercial operation date of June 30, 2028.

The point of interconnection for the Cielo Vista Power Gas Plant is Tap 345kV Bus #5901 Miguel5 - Bus #80079 Cruce7A Ckt 1. The project's interconnection status is currently listed as active within the ERCOT queue.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Duval

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Cielo Vista Power, LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

Tap 345kV Bus #5901 Miguel5 - Bus #80079 Cruce7A Ckt 1

Data Source

Live · ERCOT

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.