Reunion Solar
600.9 MW generation in Wilbarger, TX · In queue since March 2025 · Proposed COD July 2028
600.9 MW
Capacity
0
Components
1y 2m
In Queue
—
IA Status
COD target: 2028
Total Duration
3y 4m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-07-01
Reunion Solar is a proposed 600.9 MW solar photovoltaic generation project located in Wilbarger County, Texas. Developed by Reunion Solar, LLC, the project is currently active in the ERCOT interconnection queue as entry ERCOT-28INR0332, with a queue entry date of March 24, 2025. The proposed commercial operation date is July 1, 2028. The point of interconnection is Tap 345kV #60504 Tesla Road to #6111 Riley.
The Reunion Solar project has been the subject of recent news coverage, with 68 articles related to the project, primarily focusing on deals within the energy industry.
Generated from interconnection queue and public data sources
State
TX
County
Wilbarger
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Reunion Solar, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap 345kV #60504 Tesla Road to #6111 Riley
Data Source
Live · ERCOT
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Top solar plant owners in the US
Data tables and metrics from the powerplantsinfo.org database.
Compare Texas vs California solar
Summary analysis with parallel narrative sections and visualizations.
Top 10 solar states
Data tables and metrics from the powerplantsinfo.org database.