Corralitos Wind 3
196.1 MW generation in Zapata, TX · In queue since June 2025 · Proposed COD May 2028
196.1 MW
Capacity
0
Components
11 months
In Queue
—
IA Status
COD target: 2028
Total Duration
2y 11m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-05-31
Corralitos Wind 3 is a proposed wind generation project located in Zapata County, Texas, with a total capacity of 196.1 MW. The project, being developed by Las Crestas Wind Energy, LLC, is currently active in the ERCOT interconnection queue as entry ERCOT-28INR0339, with a queue entry date of June 13, 2025. The proposed commercial operation date is May 31, 2028.
The point of interconnection for Corralitos Wind 3 is the ETT 345 kV Tiempo #80224 Substation, tapping on the 345kV 80225 CENIZO7C - 80307 DELSOL7C line. The project utilizes wind turbine technology for electricity generation.
Generated from interconnection queue and public data sources
State
TX
County
Zapata
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Las Crestas Wind Energy, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
ETT 345 kV Tiempo #80224 Substation (Tap on 345kV 80225 CENIZO7C - 80307 DELSOL7C)
Data Source
Live · ERCOT
- ISO / RTO
- ERCOT
- Trading Hub
- HB_WEST
- Hub Confidence
- MEDIUM
- POI Substation
- Substation 41
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Corralitos Wind 3