Cherry Sage Storage 1 SLF (ERCOT-28INR0359) — Project Summary

Queue ID
ERCOT-28INR0359
Capacity
150.28 MW
Technology
Battery
Status
active
Location
Concho, TX
Region
ERCOT
Developer
Cherry Sage Storage 1 LLC
IA Status

Cherry Sage Storage 1 SLF

ERCOT-28INR0359BetaActiveOtherBattery Energy StorageERCOTLive · ERCOT

150.28 MW hybrid in Concho, TX · In queue since April 2025 · Proposed COD February 2029

150.28 MW

Capacity

0

Components

1y 1m

In Queue

IA Status

COD target: 2029

Interconnection

Total Duration

3y 10m

Pre-Study0%
Queue EntryApr 25, 2025

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-02-23

About

Cherry Sage Storage 1 SLF is a proposed 150.28 MW hybrid energy project located in Concho County, Texas. The project, developed by Cherry Sage Storage 1 LLC, consists of battery energy storage and other unspecified technologies. It is listed in the ERCOT interconnection queue as entry ERCOT-28INR0359, with a queue entry date of April 25, 2025.

The proposed commercial operation date (COD) for Cherry Sage Storage 1 SLF is February 23, 2029. The point of interconnection (POI) is at the Treadwell 138kV substation, identified as #60423. The project's interconnection status is currently active.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Concho

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Cherry Sage Storage 1 LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

(#60423) TREADWELL 138kV.

Data Source

Live · ERCOT

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Cherry Sage Storage 1 SLF