Cherry Sage Storage 1 SLF
150.28 MW hybrid in Concho, TX · In queue since April 2025 · Proposed COD February 2029
150.28 MW
Capacity
0
Components
1y 1m
In Queue
—
IA Status
COD target: 2029
Total Duration
3y 10m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2029-02-23
Cherry Sage Storage 1 SLF is a proposed 150.28 MW hybrid energy project located in Concho County, Texas. The project, developed by Cherry Sage Storage 1 LLC, consists of battery energy storage and other unspecified technologies. It is listed in the ERCOT interconnection queue as entry ERCOT-28INR0359, with a queue entry date of April 25, 2025.
The proposed commercial operation date (COD) for Cherry Sage Storage 1 SLF is February 23, 2029. The point of interconnection (POI) is at the Treadwell 138kV substation, identified as #60423. The project's interconnection status is currently active.
Generated from interconnection queue and public data sources
State
TX
County
Concho
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Cherry Sage Storage 1 LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
(#60423) TREADWELL 138kV.
Data Source
Live · ERCOT
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Cherry Sage Storage 1 SLF