Berryman Road Storage (ERCOT-28INR0373) — Project Summary

Queue ID
ERCOT-28INR0373
Capacity
154.09 MW
Technology
Battery
Status
active
Location
Archer, TX
Region
ERCOT
Developer
Horizon Energy Storage Greenfield Project Holdings LLC
IA Status

Berryman Road Storage

ERCOT-28INR0373BetaActiveOtherBattery Energy StorageERCOTLive · ERCOT

154.09 MW hybrid in Archer, TX · In queue since June 2025 · Proposed COD April 2029

154.09 MW

Capacity

0

Components

11 months

In Queue

IA Status

COD target: 2029

Interconnection

Total Duration

3y 10m

Pre-Study0%
Queue EntryJun 5, 2025

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-04-16

About

The Berryman Road Storage project is a proposed 154.09 MW hybrid development in Archer County, Texas. The project, being developed by Horizon Energy Storage Greenfield Project Holdings LLC, consists of battery energy storage. It is currently active in the ERCOT interconnection queue as entry ERCOT-28INR0373, with a queue entry date of June 5, 2025, and a proposed commercial operation date of April 16, 2029.

The point of interconnection for the project is Tap 138kV 1424# Bowman Substation - 11525# Short grass Substation.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Archer

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Horizon Energy Storage Greenfield Project Holdings LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

Tap 138kV 1424# Bowman Substation - 11525# Short grass Substation

Data Source

Live · ERCOT

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
MEDIUM
POI Substation
Bowman Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Berryman Road Storage