Galaxy Solar 2 (ERCOT-28INR0385) — Project Summary

Queue ID
ERCOT-28INR0385
Capacity
301.64 MW
Technology
Solar
Status
active
Location
Ellis, TX
Region
ERCOT
Developer
Galaxy Solar 2, LLC
IA Status

Galaxy Solar 2

ERCOT-28INR0385BetaActiveSolarPhotovoltaic SolarERCOTLive · ERCOT

301.64 MW generation in Ellis, TX · In queue since June 2025 · Proposed COD October 2029

301.64 MW

Capacity

0

Components

11 months

In Queue

IA Status

COD target: 2029

Interconnection

Total Duration

4y 4m

Pre-Study0%
Queue EntryJun 19, 2025

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-10-30

About

Galaxy Solar 2 is a proposed solar generation project located in Ellis County, Texas, within the ERCOT region. The project, developed by Galaxy Solar 2, LLC, has a total capacity of 301.64 MW. It consists of photovoltaic solar technology.

The project is currently active in the ERCOT interconnection queue under queue ID ERCOT-28INR0385, with an entry date of June 19, 2025. The proposed commercial operation date is October 30, 2029.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Ellis

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Galaxy Solar 2, LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

3/4-Breaker Ring Bus at 345kV Venus Switch (#1907) BKR 4920 - Navarro Switch (LST) (#68091) BKR 3B3134/3B3127

Data Source

Live · ERCOT

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.