Tri-X BESS 1 SLF (ERCOT-28INR0389) — Project Summary

Queue ID
ERCOT-28INR0389
Capacity
205.3 MW
Technology
Battery
Status
active
Location
Crane, TX
Region
ERCOT
Developer
Crane I Solar Electric, LLC
IA Status

Tri-X BESS 1 SLF

ERCOT-28INR0389BetaActiveOtherBattery Energy StorageERCOTLive · ERCOT

205.3 MW hybrid in Crane, TX · In queue since August 2025 · Proposed COD December 2027

205.3 MW

Capacity

0

Components

9 months

In Queue

IA Status

COD target: 2027

Interconnection

Total Duration

2y 4m

Pre-Study0%
Queue EntryAug 18, 2025

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2027-12-01

About

The Tri-X BESS 1 SLF project is a proposed 205.3 MW hybrid battery energy storage system located in Crane County, Texas. The project, developed by Crane I Solar Electric, LLC, is interconnected within the ERCOT region under queue ID ERCOT-28INR0389. The project entered the interconnection queue on August 18, 2025, with a proposed commercial operation date of December 1, 2027.

The Tri-X BESS 1 SLF project is listed as an active project in the ERCOT interconnection queue. The point of interconnection is the 138 kV Soda Lake substation (#76026). The project has appeared in recent news coverage regarding energy storage development in Texas.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Crane

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Crane I Solar Electric, LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

138 kV Soda Lake (#76026)

Data Source

Live · ERCOT

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Tri-X BESS 1 SLF