PRI Solar
63.84 MW generation in Howard, TX · In queue since July 2025 · Proposed COD January 2027
63.84 MW
Capacity
0
Components
10 months
In Queue
—
IA Status
COD target: 2027
Total Duration
1y 6m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2027-01-31
The PRI Solar project is a proposed 63.84 MW solar photovoltaic generation project located in Howard County, Texas. Developed by BHER Power Resources, Inc., the project is in the ERCOT interconnection queue as entry ERCOT-28INR0419, with a queue entry date of July 29, 2025, and a proposed commercial operation date of January 31, 2027. The point of interconnection is the 345 kV Falcon Seaboard (#1025) substation operated by Oncor.
The proposed project has been the subject of recent news coverage, with two articles categorized as industry and regulatory news.
Generated from interconnection queue and public data sources
State
TX
County
Howard
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
BHER Power Resources, Inc.
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
The 345 kV Falcon Seaboard (#1025) substation; Oncor
Data Source
Live · ERCOT
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Last updated 2026-03-14