Gulf Prairie BESS (ERCOT-28INR0448) — Project Summary

Queue ID
ERCOT-28INR0448
Capacity
207.78 MW
Technology
Battery
Status
active
Location
Brazoria, TX
Region
ERCOT
Developer
Gulf Prairie Energy LLC
IA Status

Gulf Prairie BESS

ERCOT-28INR0448BetaActiveOtherBattery Energy StorageERCOTLive · ERCOT

207.78 MW hybrid in Brazoria, TX · In queue since September 2025 · Proposed COD December 2028

207.78 MW

Capacity

0

Components

8 months

In Queue

IA Status

COD target: 2028

Interconnection

Total Duration

3y 3m

Pre-Study0%
Queue EntrySep 22, 2025

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-12-01

About

Gulf Prairie BESS is a proposed 207.78 MW hybrid battery energy storage project located in Brazoria County, Texas. Developed by Gulf Prairie Energy LLC, the project is listed in the ERCOT interconnection queue as entry ERCOT-28INR0448, with a queue entry date of September 22, 2025. The proposed commercial operation date is December 1, 2028.

The point of interconnection is specified as a loop on either the 138 kV circuit 82 between RIWOOD (#43150) and Angleton (#42110), or on the 345 kV circuit 18 between DOW (#42500) and Huizache (#46640). The project's interconnection status is currently active.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Brazoria

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Gulf Prairie Energy LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

(CEHESub) looped either 1) on 138 kV circuit 82 between RIWOOD (#43150) and Angleton (#42110), or 2) on 345 kV circuit 18 between DOW (#42500) and Huizache (#46640)

Data Source

Live · ERCOT

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Gulf Prairie BESS